This product is no longer promoted on Made-in-China.com. If you find any infringement or sensitive information of it, please contact us for handling. Thank you.

High Rise Building Work Stage Electrical Scaffolding Mast Climber Climbing Work Platform

Product Details
After-sales Service: 1 Year Warranty
Warranty: 1 Year Warranty
Application: Workshop Crane, Shipboard Crane, Warehouse Crane, Building Crane
  • High Rise Building Work Stage Electrical Scaffolding Mast Climber Climbing Work Platform
  • High Rise Building Work Stage Electrical Scaffolding Mast Climber Climbing Work Platform
  • High Rise Building Work Stage Electrical Scaffolding Mast Climber Climbing Work Platform
  • High Rise Building Work Stage Electrical Scaffolding Mast Climber Climbing Work Platform
  • High Rise Building Work Stage Electrical Scaffolding Mast Climber Climbing Work Platform
  • High Rise Building Work Stage Electrical Scaffolding Mast Climber Climbing Work Platform
Find Similar Products

Basic Info.

Model NO.
STRONG
Lift Mechanism
Rack&Pinion
Carrying Capacity
Weight Level
Moves
Moving
Driven Type
Rack&Pinion
Running Mode
Moving
Feature
Insulating
Certification
CE, ISO 9001
Lifting Speed
0-6m/Min
Max Lifting Height
200m
Free Standing Height When Working
6m
Free Standing Height When Erecting
15m
Tie-in Interval
7.5m
Max Wind Speed Allowed for Working
12.7m/S
Max Wind Speed Allowed for Erection
8m/S
Platform Weight
115kg
Voltage/Frequency
380V/50Hz
Control Voltage/Frequency
24V/50Hz
Weight of Normal Mast Section
80kg
Mast Section Size
0.5m*0.5m*1.508m
Platform Section Size
1.5m*1.35m*0.65m
Transport Package
Wooden
Trademark
STRONG
Origin
Shanghai
HS Code
8428909090
Production Capacity
6000sets/Year

Product Description


Facade lifting electric scaffolding motorized platform mast climber lift heavy duty load platform

-Product Description:

Mast Climbing Work Platform, adopting rack & pinion driving system, is used   for external decoration and cleaning of buildings, glass curtain wall construction and maintenance and so on.
High Rise Building Work Stage Electrical Scaffolding Mast Climber Climbing Work Platform
With maximum length of 30m long platform, there is enough space for materials and workers ,so the working efficiency is greatly improved.There is also telescopic platform available to adapt different shape of facade. Also the length of platform can be adjusted as required at project sites.

It adopts rack & pinion transmission with complete set of safety devices to ensure the security of workers.
The installation and dismantling of our platform is very easy. The driving unit are complete system without installation at site. Equipped with mobile chassis, it is very easy to transfer project sites and convenient to transport.



-Technical data
 Single MastDouble Mast
Min/Min Platform Length4/10m11/30m
Max Load Capacity2000/1500 kg3600/2000kg
Lifting Speed0~6m/min0~6m/min
Maximum Lifting Height200m200m
Tie-in Interval7.5m7.5m
Free Standing Height when working6 m6 m
Free Standing Height when erecting15 m15 m
Max Wind Speed Allowed for Working12.7m/s
Max Wind Speed Allowed for Erection6 m/s
Dimensions & Weight
Platform Section Size1.5m×1.35m×0.65m1.5m×1.35m×0.65m
Telescopic Platform max Extension0.9m0.9m
Platform Weight115kg115kg
Mast Section Size0.5m×0.5m×1.508m0.5m×0.5m×1.508m
Weight of Normal Mast Section80kg80kg
Weight of Thickened Mast Section
106kg

106kg
Weight of Transit Mast Section  
Weight of Base Unit526kg526kg
Weight of Driving Unit91kg91kg
Electrical Parameters
Driving System2.2kw×22.2 kw×2 +2.2 kw×2
Voltage / Frequency380V/50Hz380V/50Hz
Control Voltage / Frequency24V/50Hz24V/50Hz
Starting Current16.5A33A
Working Current11A22A

High Rise Building Work Stage Electrical Scaffolding Mast Climber Climbing Work Platform-SINGLE MAST PLATFORM
Platform LengthLoad Capacity (kg)
LN (L)Drive UnitN (R)TTcTosTis
4m1x1.5m1m1x1.5m2000150010001000
7m2x1.5m1m2x1.5m171012001000900
10m3x1.5m1m3x1.5m15001000500750
L: Platform Length
N(L): Left Wing Composition N(R): Right Wing Composition T: Load
Tc: Maximum Evenly Distributed Load at cantilever side Tos: Maximum Concentrated Load at outside part of Wing Tis: Maximum Concentrated Load at inside part of Wing


High Rise Building Work Stage Electrical Scaffolding Mast Climber Climbing Work Platform-DOUBLE MAST PLATFORM
Platform Length AssemblyLoad (KG)
L(m)WN(L)N(M)Driving UnitN(R)TTmTmisTcTos
11m7m1x1.54x1.52x1m1x1.536003600178015001000
12.5m8.5m1x1.55x1.52x1m1x1.535603560178015001000
14m10m1x1.56x1.52x1m1x1.534303430172015001000
14m7m2x1.54x1.52x1m2x1.534303430172012001000
15.5m11.5m1x1.57x1.52x1m1x1.533003300130015001000
15.5m8.5m2x1.55x1.52x1m2x1.533003300165012001000
17m13m1x1.58x1.52x1m1x1.531703170110015001000
17m10m2x1.56x1.52x1m2x1.531703170159012001000
17m7m3x1.54x1.52x1m3x1.53170317015901000500
18.5m14.5m1x1.59x1.52x1m1x1.530402000100015001000
18.5m11.5m2x1.57x1.52x1m2x1.530403040152012001000
18.5m8.5m3x1.53x1.52x1m3x1.53040304015201000500
20161x1.510x1.52x1m1x1.52910150080015001000
20132x1.58x1.52x1m2x1.529102910120012001000
20103x1.56x1.52x1m3x1.52910291014601000500
21.514.52x1.59x1.52x1m2x1.527802000110012001000
21.511.53x1.57x1.52x1m3x1.52780278013901000500
23162x1.510x1.52x1m2x1.52650150080012001000
23133x1.58x1.52x1m3x1.52650265013301000500
24.514.53x1.59x1.52x1m3x1.52520200012601000500
26163x1.510x1.52x1m3x1.5239015008001200500
26192x1.512x1.52x1m2x1.52390130050012001000
29193x1.512x1.52x1m3x1.5213013005001000500
30203x1.512x1.5+1x12x1m3x1.5200012004001000500
L: Platform Length W: Distance Between center of two masts
N(L):  Left Wing Composition N(M): Central Deck Composition
N(R):  Right Wing Composition T: Load Tm: Maximum Evenly Distributed Load in the middle
Tmis: Maximum Concentrated Load at innermost side of middle area. Tc: Maximum Evenly Distributed Load at cantilever side
Tos: Maximum Concentrated Load at outside part of cantilever



High Rise Building Work Stage Electrical Scaffolding Mast Climber Climbing Work PlatformHigh Rise Building Work Stage Electrical Scaffolding Mast Climber Climbing Work Platform
-Safety Features:
No.Safety Features
1Two geared motors per mast with magnetic brakes
2Over speed emergency brakes
3Automatic horizontal regulation system
4Emergency stop button
5Phase control
6Emergency Manual descending
7Overload Protection
8Limit switches for maximum and minimum height
9Phase control and over current electrical protection
10Safety top mast section with interrupted rack
11Non sliding floor (Aluminum)
12Base level control system
13Low voltage panel
14Emergency Centrifugal Safety Device
15Telescopic extension with non sliding floor and double fixing system
16Control voltage 24V AC
17Motor protection cover plate
18Access doors with interlocked limit switches
19Hot dip galvanized structural elements for long life span.
20Audio travel alarm
21Base leveling screw jacks with safety locks
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now